Lot 206 on SP225093 | Residential Land Use
Subdivision Approved for 18 proposed lots, sizes ranging from 920 m² to 2,800 m²
Infrastructure established inludes:
• Underground Electrical Supply: A dedicated underground cable provides power to the pump station, supporting reliable operation of water infrastructure.
• Water Main Connection: An 8-inch main line runs from the pump station to the elevated storage tank, ensuring consistent water delivery across the site.
• Pressure Booster System: The site features a 4-stage pressure booster pump equipped with telemetrics.
• Road Easement Access: A road easement has been extended westward to allow direct vehicular access to the pump station for maintenance and operational needs.
• Stormwater Management: A council-approved stormwater easement is in place to manage runoff and support compliant drainage across the subdivision.
Set on gently rolling countryside, this spacious block offers a blend of open land and natural greenery—perfect for developing lifestyle lots
Full engineering drawings available upon request
Call Peter Francis on 0409 095 703 for additional information on this exciting subdivision opportunity.